Industrial plant and chimneys at dusk

Industrial & logistics efficiency

Specialised solutions for every facility

We help you cut costs and increase capacity. We work with factories and warehouses across Saudi Arabia to raise operational efficiency with well-studied solutions and measurable results.

−51% labour requirement, identified in our automation study for a glass plant, with a 1.5-year payback

−40 of 200 production workers, saved by automating packaging at a food plant, with payback in under a year

+82% output at a coffee roaster's labelling station, run by one worker instead of 2–4, with zero investment

+27% daily sourdough output at an artisanal bakery (235 → 300 loaves), after re-planning shifts and the kitchen layout

What does your challenge look like?

Increasing demand, limited capacity

With the ever-growing development in the Kingdom and its current and future mega projects, facilities face challenges such as rising manpower costs, demand exceeding production capacity, and many more.

Considering these developments, automation and digitalisation can help some facilities, while others would benefit greatly from re-arranging their processes and increasing their efficiency, without intensive capital investment.

Facing any of these?

More about our services

Our innovative methodology

The Triple-E Methodology

Our consultants have studied projects worth over SAR 1 billion and helped dozens of factories increase their efficiency. Based on that experience, we developed a unique, innovative approach.

  1. 1

    Exploration Phase one

    We hold an initial meeting with the working team and upper management to assess the status quo and determine whether our intervention would benefit you. This step includes a site visit and at least one meeting with upper management and the working team.

  2. 2

    Evaluation Phase two

    Once we confirm we can add value, we go deeper. Our team visits your facility several times a week and works closely with your people to collect, analyse and simulate data on advanced computer models, stress-testing multiple solutions before implementing them on the ground.

    This phase also includes a preliminary digital transformation assessment and a plan for where the facility can improve.

  3. 3

    Execution Phase three

    We implement the prioritised solutions with your assigned team, measure their success, and present to upper management: every implemented solution with its financial impact, plus further opportunities with their estimated investment and impact.

    If digital transformation or automation is found to be critically beneficial, it is presented too.

Our experience

Clients

  • Arriyadh Roaster
  • Breddy artisanal bakery
  • Jawdah Industrial Co. Ltd.
  • Kharj Water
  • Mashar
  • Raffia packaging and plastic fibres factory

Measurable results

Sectors we've served

Roasted coffee beans pouring out of a roaster Coffee beans

+82%labelling-station output

Coffee: packaging & labelling

We measured the printing and labelling station at a coffee roaster with on-site cameras and time studies, then redesigned its layout and workflow. Output rose 82%, with one worker instead of 2–4 and zero investment.

Fresh bread rolls on an automated production line Food

40workers saved by automation

Food: packaging automation

By selecting the right packaging machines, the team delivered an automation solution that reduced the workforce by 40 of 200 production workers, with a payback period of less than a year.

Worker operating a tempered glass production line Glass & construction

−51%labour requirement

Glass: automation study

Our consultants worked with a tempered glass producer in the Kingdom on a study to automate its processes. The study prioritised the stages needing the least investment for the largest labour savings: a 51% lower manpower requirement, with a 1.5-year payback.

Success story

Arriyadh Roaster's success story

Watch how Arriyadh Roaster worked with Gauge (video in Arabic).

More on our YouTube channel

Certificates

Professionally proud to be serving you

  • MIMR certified

    All our studies are prepared by consultants certified by the Ministry of Industry and Mineral Resources.

  • Certified assessors

    All digital transformation assessment & plan services are prepared by certified SIRI assessors.

  • World-class experience

    Our consultants were trained in Japan by professionals from Japanese factories, in cooperation with Toyota.

  • Cost first

    Our consultants are Certified Management Accountants (CMA) who always consider the financial impact.

Book your free initial meeting now

We'll discuss your facility's challenges and decide together whether our services are the right fit.